News and Information

YUHENG EMS: Solar Installed, Storage Added — So Why Don't the Numbers Add Up?

In 2026, corporate energy management is going through a rule change.

In April 2024, the Shanghai, Shenzhen and Beijing stock exchanges issued the Corporate Sustainability Disclosure Guidelines (Trial), designating mandatory disclosure companies that had to publish 2025 sustainability reports by 30 April 2026 at the latest. On that day, all 430 mandatory filers reported on time — a 100% compliance rate — and 2,720 A-share companies in total had disclosed, a market-wide rate of 49.0%. In January 2026, the exchanges issued revised preparation guides adding three new topic-specific standards — "Pollutant Emissions", "Energy Use" and "Water Use". For the first time, the accounting rules for energy data have been written into hard regulation.

In January 2026, the National Energy Administration published 2025 green certificate data: 930 million green certificates were traded nationwide, up 108% year on year. The average price of standalone certificate trades climbed from CNY 0.72 in 2023 and earlier, to CNY 2.12 in 2024, to CNY 5.57 in 2025 — nearly a sevenfold increase in two years.

On the carbon side, the national ETS expanded for the first time in 2025 to steel, cement and aluminium smelting — 3,378 key emitters across four industries, covering roughly 8 billion tonnes of CO₂. In 2026 the covered entities rose to 3,680, covering about 8.3 billion tonnes — more than 65% of national emissions. In 2025, allowance trading reached 235 million tonnes with a turnover of CNY 14.63 billion, and compliance topped 99.99%.

On the power market side, 6.64 trillion kWh were traded in market transactions in 2025 — 64.0% of total electricity consumption. In other words, two out of every three kWh now change hands through the market. Green power trading reached 328.5 billion kWh, up 38.3% year on year and 18 times the 2022 volume. By 2027, virtual power plants are expected to provide more than 20 GW of dispatchable flexibility.

Beyond China's borders, the EU Carbon Border Adjustment Mechanism (CBAM) entered its definitive taxation phase on 1 January 2026, covering steel, aluminium, cement, fertilisers, electricity and hydrogen. Q1 2026 certificate prices hit EUR 75.36 per tonne — roughly CNY 600, more than six times China's carbon price.


These five developments sit in different ministries, different markets, different countries — yet they all point to the same answer:

Corporate energy data must move from "estimates" to "measurements". ESG reports need total energy consumption. Power markets need real-time controllability. Green certificates need time-of-generation matching. Carbon markets need emissions accounting. CBAM needs product carbon footprints. Only one type of system can get all five right at once: an enterprise-grade EMS.


1. The pain first: solar installed, storage added — and energy still unmanaged

Many companies already run distributed PV, some with storage. Yet after a year, the savings disappoint and the accounts don't add up.

The problem is usually not the equipment — it is that the equipment has no brain.

Pain pointTypical scenarioEstimated annual loss
Can't seePV, storage and load data sit in separate vendor platforms; manual meter reads lag behind; device status opaqueO&M costs 30%+ higher
Can't controlPeak-valley spreads missed, demand charges breached, anti-reverse-flow ineffective, crude charge/discharge strategiesElectricity bills 10–15% higher
Can't optimiseGeneration and load estimated by experience; storage cycling at the wrong times; batteries aged in unfavourable bandsBattery life cut by 15–20%
Can't proveIn the era of mandatory ESG disclosure, energy and carbon data compiled by hand — inconsistent scopes, verification reworkCompliance risk + rating damage
Can't monetiseGreen certificates never issued or traded, storage never in demand response, surplus carbon allowances never cashed, spreads never arbitrageIdle assets; annual losses from hundreds of thousands to millions of CNY

Key insight: PV and storage are the hands; the EMS is the brain. Hands without a brain only perform rehearsed moves. With a brain, they respond optimally to price, load and policy. The same 2 MW PV + 1 MWh storage system can earn hundreds of thousands of CNY more per year simply by adding an EMS.


2. What an enterprise EMS is: cloud–edge–device architecture, plus one hard rule — control survives network loss

2.1 Three layers: cloud for data, edge for control, devices for acquisition

Cloud platform layer: a unified data model in the data hub, AI engines for forecasting and dispatch, application services carrying all business functions. Multi-tenant architecture — one platform manages many projects, and new-site onboarding shrinks from weeks to days. The product architecture and data model of this layer are defined in-house by HPY.

Edge gateway layer: deployed on site, handling protocol conversion, data buffering, local control and store-and-forward. When the network drops, data is cached locally and re-synced automatically on recovery.

Field device layer: PV arrays, storage systems, inverters/PCS, switchgear, smart meters and loads, connected via Modbus, IEC 61850, CAN, DL/T 645 and other protocols.

2.2 One hard rule: control logic runs locally — offline, still in control

There is a class of "cloud-only EMS" on the market: every control decision is computed in the cloud and pushed down over the network. When the network hiccups, the strategy stops — storage halts mid-cycle, anti-reverse-flow fails, demand control goes blind.

YUHENG EMS takes a different division of labour: local control + cloud management.

① ② ③ Control strategies run on the local coordination controller — if 4G or the network drops, local strategies keep executing: storage keeps charging and discharging, anti-reverse-flow keeps protecting, demand keeps being managed, faults keep being handled.

④ The cloud handles data aggregation, reporting and settlement, AI model training and strategy iteration. When the network recovers, data backfills automatically — no history is lost.

In one sentence: offline, still in control. For C&I storage this is not a nice-to-have. Nobody stands next to the cabinets, and the network will never be up forever — so control authority must stay on site.

2.3 Three-tier networking: one cabinet, many cabinets, many arrays

TierConfigurationTypical use
Single1 local coordination controller connecting PCS, BMS, thermal management, fire suppression, meters and UPSA single storage cabinet, single-site projects
ClusterOne local controller per cabinet, all feeding one aggregator (up to 15 cabinets recommended)Multi-cabinet storage clusters on one site
Multi-arrayPer-array switches or controllers feed the aggregator, then up to the cloud via industrial gatewaysLarge campuses, multi-site fleets

2.4 Hardware spec: built for sites without a server room

ItemSpecification
ProcessorIndustrial embedded processor, 800 MHz
Serial ports8 × RS485 (600 bps – 230.4 kbps)
Ethernet2 × 10/100 Mbps auto-sensing RJ45
Digital I/ODI × 4 / DO × 4, optically isolated
Supply voltage9–60 V DC wide-range input
Operating temp-40 °C to +85 °C; storage -50 °C to +100 °C
MountingDIN-rail, 143 × 47 × 104 mm
ProtocolsIEC 104, Modbus, MQTT, DL/T 645 and more

Key insight: -40 °C to 85 °C wide temperature, 9–60 V wide voltage, DIN-rail mounting — it goes into un-air-conditioned switch rooms and next to outdoor transformer cabinets, without a dedicated server room. On a real project site, that adaptability matters more than compute on a datasheet.


3. Seven operating strategies: where an EMS actually earns its keep

Anyone can build a monitoring dashboard. The real difference between EMS products hides in the strategy engine — for the same battery, when to charge, when to discharge and how much determines how much it earns and how long it lives.

StrategyCore logicEconomic value
Energy managementBenefit-first: dynamically decide whether PV power feeds loads, charges storage or is exportedMaximises overall returns
Anti-reverse-flowDual mode: soft (modulating inverter output) + hard (emergency disconnection at the grid connection point)Avoids reverse-flow penalties
Demand managementReal-time monitoring of transformer peak demand; near the threshold, storage discharges to shave or non-critical loads step downCuts fixed demand charges 10–30%
Peak shaving & valley fillingTime-of-use scheduling: charge in valley hours, coordinate in flat hours, discharge in peak hours to displace expensive purchasesMonetises the peak-valley spread directly
Anti-overloadFour-level priority cascade prevents trips and equipment damageProtects supply continuity
Day-ahead price schedulingPulls next-day time-of-use prices daily; generates charge/discharge plans against SOC limits and power capsMaximises price-spread returns
AI edge-computed optimisationEdge AI on historical run data; multi-dimensional time-series forecasting of load, PV output and prices for medium/long-term optimal dispatchSelf-adapting, self-optimising system

Three details are worth expanding:

First, why does anti-reverse-flow need two modes? Soft mode suppresses reverse flow at the source — by modulating inverter output, grid-connection power never falls below the set export limit, smoothly and without shocks. Hard mode is the last line of defence — in emergencies, the grid tie opens directly. The former protects economics, the latter protects safety. You need both.

Second, the four-level anti-overload priority. When power reaches or exceeds the rated threshold, the system acts in order: storage adjustment → curtail PV → shed non-critical loads → emergency disconnection. Lossless adjustments come first, loads next, switching last — avoiding one-size-fits-all blackouts.

Third, AI strategy is not hype — it is a loop. The whole system runs on a cycle of forecast → optimise → control → feedback → model iteration. Every charge/discharge cycle feeds real outcomes back as training data, making the next forecast sharper and the next plan better.

Key insight: day-ahead price scheduling and real-time safety strategies need explicit priority — the economically optimal plan must yield to safety responses in an emergency. That demands a strategy engine with priority arbitration, not a flat table.


4. Cloud platform and app: turning "manageable" into an everyday reality

4.1 Seven cloud-platform modules

ModuleCapabilities
OverviewPortfolio-wide data across all connected sites; charts, map and list views
MonitoringSite monitoring, single-line diagrams, power monitoring, device monitoring, event management, run settings, load analysis, AGC/AVC
AssetsAsset registry, point data, base information, alarm history, device navigation and map distribution
AnalyticsSystem reports, inverter reports, PCS reports, PV-storage reports, custom reports, time-of-use consumption, performance analysis
O&MMaintenance plans, work-order management, alarm management, defect management — full closed loop
AI agentPower forecasting, AI Q&A, AI report generation, intelligent alarm and defect analysis
Health checkMetric-level site audits: automatic analysis of run data, quantified equipment scoring, precise anomaly localisation — findings convert to defect tickets in one click

The health check module is the most underrated. Most platforms only act "when an alarm fires". Health check proactively audits the site — analysing run data metric by metric, scoring equipment performance, surfacing latent anomalies early, and passing them straight into the defect workflow. A closed loop from finding problems to fixing them.

For storage sites scattered across regions, that means you don't need someone watching screens all day — the system tells you what's wrong.

4.2 Five app modules: run the plant from your phone

ModuleCapabilities
HomePortfolio data within your permissions: site count and capacity, live run data, power and energy trends
MonitorSite list, custom cards, filtering and sorting, drill-down to site overviews and device details
O&MAlarms, defects, maintenance tasks; one-click alarm-to-defect conversion with AI cause analysis and recommendations
AIPV-storage knowledge base + live platform data: online Q&A, data queries, AI report generation
SettingsAccount, language and theme, notifications and version management

5. The maths: how fast does an EMS pay for itself

An enterprise EMS is a small share of total project investment — but it sets the ceiling on what the whole project earns.

Project typeScaleEMS investmentAnnual savings / revenuePayback
C&I solar + storage2 MW PV + 1 MWh storageCNY 150k–250kCNY 450k–700k0.4–0.7 years
Telecom sites100 sitesCNY 300k–500kCNY 500k–800k0.6–1 year
Campus microgrid5 MW PV + 2 MWh storageCNY 300k–500kCNY 900k–1.4M0.3–0.5 years
Energy-intensive manufacturing10 GWh Li-ion cell plantCNY 2M–5MCNY 17M–34M1–2 years

Note: indicative industry figures; actual returns depend on project design. Investment covers hardware (meters / gateways / servers), software and implementation services. Savings cover electricity cost reduction, green certificate trading, demand response and carbon trading.

5.1 The ledger of a 2 MW PV + 1 MWh storage project

Take a manufacturing company with 2 MW PV + 1 MWh storage. After connecting the enterprise EMS:

Revenue sourceAmount / effect
Additional annual peak-valley arbitrage+CNY 280k / year
Demand-charge savingsCNY 150k / year
Green certificate trading income≈ CNY 30k / year
Demand response compensation≈ CNY 50k / year
Self-consumption ratio72% → 91%
Overall payback periodShortened by 1.2 years

5.2 Three deployment options — choose by data sensitivity

DeploymentInitial costAnnual running costBest for
SaaS cloudCNY 30k–100kCNY 20k–80k / yearSmall/mid projects, multi-site
On-premiseCNY 200k–800kCNY 50k–150k / yearLarge groups, data-sensitive users
HybridCNY 150k–500kCNY 50k–120k / yearHQ + distributed sites

Key insight: the cost of an EMS and the value it unlocks are not in the same order of magnitude. For a 2 MW + 1 MWh project, the EMS costs CNY 150k–250k while the arbitrage, demand, certificate and demand-response benefits it unlocks total CNY 450k–700k per year. This is not a cost line — it is a lever.


6. Five identities of one kWh: from "saving money" to "making money"

Everything above was about cutting bills. The real change in 2026 is this: the same energy data can now be monetised in five different markets at once.

DomainMarket statusWhat the EMS directly provides
ESG disclosure2026 is the first reporting year; 430 mandatory filers 100% on time; 2,720 companies market-wide (49.0%)The only direct data source for total energy consumption, energy mix and energy intensity
Power market trading6.64 trillion kWh traded in 2025, 64.0% of national consumptionTime-of-use metering, remote data transmission, load monitoring and control — the technical entry ticket
Green power & certificates930 million certificates traded in 2025 (+108%); standalone average price CNY 5.57 (nearly 7× in two years)Settlement-grade generation metering, precise tracking of self-consumption vs export, time-matched certificate-to-power pairing
Carbon trading3,680 entities covered in 2026 across four industries (~8.3 bn t, 65%+ of national total); 2025 turnover 235 Mt / CNY 14.63 bnAutomatic energy × emission-factor accounting, live allowance surplus/deficit tracking, CCER reduction accounting
CBAM carbon tariffDefinitive taxation from 1 Jan 2026, six sectors, Q1 certificate price EUR 75.36/tEnd-to-end product carbon footprint tracking, green-power deduction evidence, English-language compliance reports

All five run on the same data chain: the metered data of one kWh flows simultaneously into ESG reports, power markets, certificate issuance, carbon accounting and product footprints.

So the real question is not "can we calculate" — it is "do the five reports reconcile?" If the ESG consumption figure, the verification emissions figure and the CBAM footprint each come from a different manual ledger, they will contradict each other the moment an auditor looks. Only one EMS as the single source of truth makes all five reports self-consistent.

Key insight: the value of an EMS is not "helping you look at data". It turns "roughly" into "precisely", "after the fact" into "in real time", and a cost centre into a profit centre. Bill savings cut cost. Compliance disclosure avoids risk. Green consumption adds points. Market trading makes money.


7. YUHENG by HPY: engineering-site experience, built into the product

7.1 The product

YUHENG Energy Management System (model HPY-YH) by HPY New Energy is an intelligent energy management platform built for C&I solar-plus-storage, energy-intensive manufacturing, campus microgrids and telecom base stations. It uses a cloud–edge–device three-layer architecture, combining IoT, big data and AI into a full closed loop from device monitoring and data analysis to intelligent dispatch.

The system helps enterprises:

  • Cut energy costs by 8–20% while keeping supply safe;
  • Raise renewable self-consumption above 95%;
  • Build a precise, trustworthy data foundation for ESG disclosure, power market trading, green certificate asset management, carbon trading and CBAM compliance.

In one sentence: see every kWh, control every cent, account for every tonne of carbon, earn from every unit of green power.

About the name "YUHENG" (煜衡): "Yu" (煜) means radiance — it carries the brand of HPY, whose root character evokes light, and with it, solar. "Heng" (衡) carries three meanings in one character: to measure (see every kWh), to balance (control every cent) and to weigh trade-offs (earn every unit of green value). One character, four promises. The English name YUHENG (pronounced yoo-HUNG) shares the same sound and is used across overseas quotations and materials.

7.2 Software capability: full-chain autonomy, with the source code in our own hands

EMS vendors fall into two broad types. One is the white-label type — hardware bought in, software outsourced, a third-party platform re-badged with a new logo. It works, at first. But product definition, iteration pace and data boundaries are not yours: customers wait in someone else's queue for new features; new site conditions can't be engineered around; if the platform shuts down, the whole system is orphaned.

The other is the autonomous type — product architecture defined in-house, core algorithms owned, source code held. HPY takes this path, expressed in three commitments: product architecture defined in-house, core control algorithms and the communication layer jointly developed, and source code self-held.

HPY fields a complete in-house software R&D team spanning embedded firmware, backend services, front-end visualisation, AI algorithms and mobile apps. A team that writes the code, plus source code we control, means product definition comes first, then implementation — not the other way round: acquiring a platform and retrofitting a story onto it.

First, the capability map — four layers, from device to cloud, all in our own hands:

LayerCapabilitiesDegree of autonomy
Edge layerControl strategy engine, multi-protocol driver library (Modbus / IEC 104 / DL/T 645 / MQTT), local coordination and logic nodes, data buffering and store-and-forwardFramework defined in-house; core control algorithms and communication layer jointly developed, source code self-held
Platform layerData hub and unified data model, time-series data services, microservices, AI algorithm engine (load forecasting / PV output forecasting / dispatch optimisation)Architecture and data model defined in-house; algorithm models iterated independently
Application layerYUHENG Cloud web platform, visualisation dashboards, mobile apps (iOS / Android), open APIs with real-time WebSocket pushDesigned and built in-house; requirement changes absorbed internally
Internal systemsData-asset and project management systems: dual-brand virtual warehousing with independent accounting, BOM sync, batch-level (FIFO) costingFully self-developed, running across our own operations end to end

A note on the last row. We don't just "write software for others" — our own procurement, warehousing, project and cost management run on systems we built ourselves. We eat our own cooking first. That is the most direct test of software capability, and the reason we can take on custom requirements with confidence.

Second, the technology stack — every choice serves the industrial site:

LayerTechnology choices
Time-series databaseTDengine / InfluxDB — second-level queries across hundreds of millions of points
Message middlewareEMQX + Kafka — millions of concurrent connections
AI algorithmsLightGBM load forecasting + reinforcement-learning dispatch optimisation
BackendSpring Cloud microservices, containerised on Kubernetes
FrontendVue3 + ECharts + DataV dashboards
MobileiOS / Android apps, iterating in step with the cloud platform
SecurityRBAC + encrypted transmission + China MLPS Level 2 (extendable to Level 3)

Third, the R&D system — we don't ship a version and walk away:

  • Full process: requirement review → solution design → development → testing → release → iteration. No skipped steps;
  • Agile cadence: quarterly feature releases; reasonable customer changes land in the next version;
  • Quality assurance: automated testing + canary releases + version rollback, so live systems are never broken by upgrades;
  • Credentials: software copyright for the energy management system, ISO 27001 information-security certification.

Now return to the hard rule from section 2.2 — control surviving network loss. It holds because the edge controller's control logic and source code are in our own hands. With white-label software, the control logic is locked inside a third party — the rule would be unenforceable, and tuning strategies to site conditions would be out of the question.

Key insight: what "autonomy" means for a customer is three things — requirements can change: when site conditions shift, we modify code we can touch, without waiting in anyone's queue; data is controllable: source code and data boundaries sit with us, and the data belongs to the customer; iteration is fast: quarterly releases, algorithm models trained continuously on real project data. Product definition rights make these three possible. White-label solutions deliver none of them.

7.3 Six core advantages

AdvantageWhat it means
Full-chain autonomyIn-house software R&D team; product architecture and unified data model defined in-house; core control algorithms and communication layer jointly developed with source code self-held. From edge controllers and the cloud platform to mobile apps, the technology roadmap and iteration pace answer to no one else, and data boundaries belong to the customer
We know the industry — and the siteYears in solar and storage across four scenarios: C&I EPC, residential export, telecom base stations, energy-intensive manufacturing. Not a generic IoT platform with a coat of paint — the product is sharpened by power-electronics engineers and software engineers working together
A true closed loopNot a dashboard that only "shows data" — a system that issues control commands and executes dispatch strategies automatically
Open ecosystem, easy to integrateStandard RESTful APIs + real-time WebSocket push; connects to ERP, MES, power trading platforms and carbon management systems. Data belongs to the customer
Multi-tenant, replicableSaaS-ready deployment; one platform manages many projects; new-site onboarding shrinks from weeks to days
Engineering DNA, reliable deliveryCompatible with mainstream inverters from Huawei, Sungrow, GoodWe, Ginlong, Growatt, SMA and others, and PCS from Sungrow, Kehua, Sineng, Sermatec and others; connects via Modbus, IEC 61850, CAN, DL/T 645

7.4 Deployment path: up and running within four weeks

① Requirements — map out sites, equipment, tariffs and load profiles; define target revenue streams;

② Solution design — fix the networking tier (single / cluster / multi-array), strategy mix and deployment mode;

③ Installation — on-site controller mounting and wiring, protocol commissioning, point-to-point verification;

④ Integration testing — strategy dispatch verification, offline store-and-forward tests, alarm linkage tests;

⑤ Go-live — cloud platform and app activation, O&M team training and handover;

⑥ Continuous operation — 7×24 technical support, quarterly feature updates, continuous model optimisation.

From first conversation to go-live, a standard project takes 2–4 weeks.

7.5 Service commitments

ItemCommitment
ImplementationStandard projects live in 2–4 weeks
Response7×24 technical support; alarms answered within 15 minutes
Data securityThree-tier backup + MLPS Level 2 (extendable to Level 3) + encrypted transmission
TrainingFree O&M personnel training with complete operation manuals

8. When to act: the policy timeline

PolicyTimingWhat it means for business
A-share ESG mandatory disclosureFirst reporting year 2026The EMS is the only credible source of energy data
Annual green certificate matching becomes bindingFrom 2026Time-of-generation metering is required, or certificate-power matching cannot comply
CBAM definitive taxation1 January 2026Product carbon footprints and green-power deduction evidence are required
Electricity spot markets running2026: majority of provincesC&I users above 10 kV enter the market; monitoring and control capability is required
Virtual power plant flexibility target20 GW by 2027Operators need systems for monitoring, forecasting and executing dispatch instructions
Carbon market expansionMost major industrial sectors by 2027Petrochemicals, chemicals, paper, aviation phased in — carbon accounting becomes a must-have
CBAM downstream expansion (proposed)1 January 2028~180 downstream steel and aluminium products brought into scope

8.1 What to do, by situation

Your situationRecommended action
Have solar + storage, data scatteredConnect a unified EMS now — get the data flowing first, then strategy optimisation. The lost revenue compounds daily
Mandatory disclosure entityDeploy an EMS now to build a "metered-grade" data foundation before the next disclosure cycle
Manufacturer exporting to the EUWithin 3 months, start product carbon footprint tracking — replace EU default values with measured ones and cut the carbon tariff directly
Distributed PV ownerWithin 3 months, add settlement-grade metering and certificate-power matching — turn certificates from "unissued" into "tradable assets"
Campus / multi-site groupWithin 6 months, plan a multi-tenant platform — solve multi-owner cost allocation and centralised O&M first, then consider virtual power plants

The energy policies of 2026 are not scattered subsidies and slogans. They are a systematic rule change: for the first time, energy data must be verifiable, comparable and traceable.

Whoever builds the metering foundation first gets the ESG pass, the power-market entry ticket, the right to trade green certificates, the strategy space in the carbon market, and the cost advantage under CBAM.

Bill savings cut cost. Compliance disclosure avoids risk. Green consumption adds points. Market trading makes money. One enterprise EMS — five layers of value.

Hardware sets the floor of a system; software decides how far it can go. Equipment can be bought — product definition rights and source code must be held. That is why HPY insists on full-chain autonomy.

Let energy management move from experience-driven to data-driven.

YUHENG Energy Management System — make every kWh worth the most.


About HPY New Energy

HPY New Energy (合普煜新能源) has spent 18 years in distributed PV EPC, liquid-cooled storage system integration, and solar-storage-charging microgrid solutions. The company maintains an in-house software R&D team and develops the YUHENG enterprise energy management system and its own data-asset management systems — full-chain autonomy, delivered as integrated hardware-plus-software. HPY also builds its own 125 kW / 261 kWh liquid-cooled storage units. Deployments span industrial plants, logistics parks, municipal facilities, commercial complexes, hospitals and urban fast-charging networks, covering the full chain from project development and financing, engineering design, equipment integration to intelligent O&M.

[Website] www.bjhpy.com

Data sources & verification

 

Related News

Solar Water Pumps: Turning Sunlight into Reliable Water Supply

YUHENG EMS: Solar Installed, Storage Added — So Why Don't the Numbers Add Up?

Grid/Off-Grid PV-ESS-Diesel Microgrid System HPY-PEDM-125kW/257kWh

Zanzibar Island-Micro‑grid Power Supply Project Cases

Application of Solar and Wind Power Generation in Forest Fire Prevention Equipment

Security Surveillance Solar-Powered System

中企跨境-全域组件 制作前进入CSS配置样式

Contact:

Email:

Tel:

WeChat:

在线客服添加返回顶部

右侧在线客服样式 1,2,3 1

图片alt标题设置: Helpyou New Energy

表单验证提示文本: Content cannot be empty!

循环体没有内容时: Sorry,no matching items were found.

CSS / JS 文件放置地